Main Project – Historical and consistent fire alarm system malfunctions, weighted against a Fire Marshal deadline and an extremely costly repair.



DoubleTree was up against a tight deadline to meet Fire Marshal compliance on a required fire alarm system replacment, facing a staggaring eight-hundred thousand dollar project cost.
DoubleTree was up against a tight deadline to meet Fire Marshal compliance on a required fire alarm system replacment, facing a staggaring eight-hundred thousand dollar project cost.
DoubleTree was up against a tight deadline to meet Fire Marshal compliance on a required fire alarm system replacment, facing a staggaring eight-hundred thousand dollar project cost.
/
Approach
Deploy a detail-driven analysis to uncover cost-saving alternatives in a complex life safety upgrade, a needle-in-the-haystack operation. Challenge — Full system replacement and new wiring for upgraded devices across 225 rooms, driving most of the project’s cost. Solution — R&D uncovered existing audible devices were compatible with an alternate fire panel. Negotiations secured a waiver to retain these devices and avoid rewiring the entire facility. Result — Shifted to a dual-compatible design, preserving infrastructure, reducing project timeline, and cutting over half a million in projected costs
Deploy a detail-driven analysis to uncover cost-saving alternatives in a complex life safety upgrade, a needle-in-the-haystack operation. Challenge — Full system replacement and new wiring for upgraded devices across 225 rooms, driving most of the project’s cost. Solution — R&D uncovered existing audible devices were compatible with an alternate fire panel. Negotiations secured a waiver to retain these devices and avoid rewiring the entire facility. Result — Shifted to a dual-compatible design, preserving infrastructure, reducing project timeline, and cutting over half a million in projected costs
Deploy a detail-driven analysis to uncover cost-saving alternatives in a complex life safety upgrade, a needle-in-the-haystack operation. Challenge — Full system replacement and new wiring for upgraded devices across 225 rooms, driving most of the project’s cost. Solution — R&D uncovered existing audible devices were compatible with an alternate fire panel. Negotiations secured a waiver to retain these devices and avoid rewiring the entire facility. Result — Shifted to a dual-compatible design, preserving infrastructure, reducing project timeline, and cutting over half a million in projected costs
results
$675K Saved
$675K Saved
Over a million saved
Hilton
Hilton
Hilton
Hilton
Hilton
Hilton















VARIABLE ©2025
A DIVISION OF INSTRUMENT
SYSTEMS, LLC
Business inquires
Estimating and Negotiation Experience?
Phone
No matter how big or small, how developed (or underdeveloped) your project is – talk to us (before someone talks you out of it).
2501 Chatham Rd. 8407
Springfield, IL 62704
VARIABLE ©2025
A DIVISION OF INSTRUMENT
SYSTEMS, LLC
Business inquires
Estimating and Negotiation Experience?
Phone
No matter how big or small, how developed (or underdeveloped) your project is – talk to us (before someone talks you out of it).
2501 Chatham Rd. 8407
Springfield, IL 62704